Tri Counties Bank Operations Center


Project Media:


Project Manager:

Image loading Rich Orchid

Supertintendent:

Bud Shope

Project Details:

Project Name:

Tri Counties Bank Operations Center


Location:

Chico, CA


Owner:

Tri Counties Bank


Project Description:

The project is a remodel/addition to an existing building, and was designed by Menemsha Solutions. The existing 22,432 sq. ft. building was demolished with the exception of the structural steel frame. Both interior and exterior designs and construction are state of the art. The construction team includes TCBK Construction Manager Chimene Cosper, Modern Building’s (former) CEO Gage Chrysler, Project Manager Rich Orchid, Contract Administrator Terry Wolkoff, Superintendent Bud Shope, and Modern’s very talented field workforce. Tri Counties Bank was incorporated in 1975, and now has 66 branches in Northern and Central California.  Modern has constructed the majority of their facilities over the years.