Tri Eagle Beverage


Project Media:


Project Manager:

Image loading Gage Chrysler

Project Details:

Project Name:

Tri Eagle Beverage


Location:

Fairfield, CA


Modern Office:

Chico, CA


Owner:

Tri Eagle Beverage


Architect:

Modern Building Inc


Project Duration:

10 months

Project Description:

A 60,000 square foot Anheiser Busch distribution facility, completed in 2002. Includes 30,000 square feet of product cold storage, keg room, truck loading docks, warehouse, all concrete paving at truck traffic areas, and administrative offices. This $3 million facility featured tilt-wall, prefabricated insulated steel roof panel construction. Six loading docks serve the warehouse.